Sep 26, 2003
E10/S3 Calibration Runplan
I. E10 (expect: S2-V3-like calibration ready for E10)
-
Prior to E10, make
-
DC calibrations and sign measurement
-
representative hardware measurements (new dewhites, anti-imaging, coil
drivers)
-
open loop gain measurement
-
update model, output reference spectra (olg, sensing, response, actuation),
handoff to Sensemon
-
ensure Sensemon has the information to give reasonable range estimate at
the outset of E10 and establish IFO performance
-
provide hardware injection group realistic actuation function as early
as possible
-
begin hardware measurements after freeze
II. S3 (expect: S2-V3-like calibration ready for S3, with
all hardware measurements completed)
-
all hardware measurements completed (model not necessarily including all
subtle effects, just obvious ones)
-
may revisit DC calibrations, etc if not satisfied with E10
-
Autocalibrator upgrades:
-
Swept sine version: better actuation function, NS-NS range, output cal
file
-
UGF version: fast determination of darm ugf, output model-based calibration
and data products
-
excitation channels
-
would like to inject calibration lines on DARM_EXC for entire run
-
requires new channel to be stored in frame and RDS, plus LSC code modification
-
eliminate ETMY_EXC from frames/RDS
-
inject long-term pulsar signal into ETMX_EXC
-
if Autocal sweeps, do on ETMY
-
runtime request
-
first 8-hour shift of S3 for calibration measurements and cal line amplitude
setting (may take less time)
-
expect to have lengthy/problematic measurements such as DC ones out of
the way prior to S3
-
expect mid and end run calibration runs
-
additional measurements include cross-coupling investigations