Preliminary Agenda of LSC Detector Characterization
Conference Call
(February 9, 2001 at 11:15 a.m. EST, 8:15 a.m. PST)
Preliminary E2 Investigation Reports:
-
E2 Investigation Updates:
-
Preparations for the E3 Engineering run (all)
-
Status reports on DMT performance characterization tasks:
Priority 1:
-
Line noise:
-
B. Allen, A. Ottewill
-
S. Klimenko
-
A. Sintes
-
Characterizing seismic noise:
-
Inter-channel correlations:
-
Bilinear cross-couplings
-
Operational state:
-
D. Chin, R. Gustafson, K. Riles
Priority 2:
-
Bandlimited RMS
-
Time / Frequency plots
-
Non-Gaussian noise
-
Status reports on DMT transient analysis tasks:
Priority 1:
-
Power spectral transients:
-
Servo instability:
-
D. Chin, R. Gustafson, K. Riles
-
Event catalog:
Priority 2:
-
Transient detection using adaptive denoising methods
-
Impulse recognition:
-
Magnetic field transients