==> PID1 Box Data VS. Nov05 MC
<==
- Preselection cuts: 1 subevt, tank hits>200, veto hits<6,
R<500cm,
YBoost9_allbkgd<-5, uz<0.8, the expected number of osc. nue
events are
17.7 assuming dm2=1.0 eV^2, sin2th2 = 0.004 (28.8 for dm2=0.4 eV^2,
sin2th2 = 0.017),
the expected background events are 36053.9 with 6E20 POT(it is slight
different from TN170
which used
Mar05 MC for estimation).
There are 44365 data events passed preselection cuts.
- The
comparison between data and Nov05 MC for visible energy, enuqe,
energymu, uz, tank hits, veto hits, rtc and rtowall
, or (pdf
file)
- 95
PID
outputs with precuts for various Enuqe bins (0-0.5 GeV,0.5-1.0 GeV,
1.0-5.0 GeV, 0-5.0 GeV)
, or (pdf
file)
- 95
PID
outputs with precuts for various visible energy bins (0-0.5
GeV, 0.5-1.0 GeV, 1.0-5.0 GeV, 0-5.0 GeV)
, or (pdf
file)
- 95
PID
outputs with precuts for various visible energy bins (0-0.5
GeV, 0.5-1.0 GeV, 1.0-1.5 GeV, 1.5-2.5 GeV, 0-2.5 GeV)
, or (pdf
file)
- Profiles
of PID outputs on visible energy, uz, rtowall and rtc.
, or (pdf
file)
- Data
and MC agreement for YBoost19-22, with profiles of PID outputs on
visible energy, uz, rtowall and rtc., or (pdf
file)